Quality and handover
From first check to final handover.
Check work as it's built, close out every finding and gather the handover information as you go. Snagging and defects is available first.
-
Snagging and defects
Capture every finding with a photo, pin it to the plan, assign it and track it to sign-off.
LiveSee how it works -
Photo records and condition surveys
Record the condition before you start and when you finish, with photos kept as evidence.
Coming soonNotify me -
Quality inspections and hold points
Inspect work at each stage and hold the next stage until it's signed off.
Coming soonNotify me -
Handover, O&M and H&S file
Gather the O&M manuals and H&S file as the job goes, not at the end.
Coming soonNotify me -
Non-conformance reports
Raise non-conformances and track the fix to sign-off.
Coming soonNotify me -
Commissioning and testing
Record tests and commissioning results for each system.
Coming soonNotify me -
Aftercare and defects liability
Manage defects reported after handover through to the end of the defects period.
Coming soonNotify me -
Asset register for the client
Hand the client a register of the assets installed, with their documents.
Coming soonNotify me
Joining a main contractor's project? It's free.
You only pay if you want all your projects, across several main contractors, in one place.